Ex Store fuel - Ravenna
N. 16 underground tanks containing mineral oils:
• N. 2 aboveground tanks, capacity 350 m3
• N. 8 underground tanks (capacity 100 m3)
• N. 2 aboveground tanks, capacity 350 m3
• N. 8 underground tanks (capacity 100 m3)
and the remaining were of lower capacity.
CONTAMINATION
Contamination of soils and groundwater.
CONTAMINANTS
Hydrocarbons – BTEX (aromatic hydrocarbons) – MtBE – IPA (Hydrocarbons polycyclic aromatic).
ACTIVITY
> Direct management of the entire procedure:
• Characterization Plan and Technical Report;
• Preliminary and Final Project of Reclamation;
• Final Technical Report;
• Design of all activities;
• Assistance of during Conferences of Services;
> Implementation of the measures additional of characterization.
> Monitoring.
> Execution of reclamation.
> Coordination and execution of all activities carried out jointly with the Authorities.
> Testing jointly with ARPA.
NO Disposal of contaminated soil.
NO Realization of complex and costly installations.
DURATION
2 years and five months
(characterization and reclamation)
COSTS
Saving of 50% compared to
the other techniques.